Operation Session Autumn 2020

Short Train on duty.

This time, believe it or not, we’ve had three battery-powered units in service, most of the time each had its own operator, too. Alas, the weather didn’t play along all the time, so a spontaneous layout extension was realized at the roofed porch. My No.1 braved the rain several times and did quite well. The encapsulated electronics really pay for themselves.

Loading Ramp: Deck and Load

The platform's boards are nailed in place.

Since the operation session draws closer I’m focused on having a working interim result rather than completing all steps perfectly. So the ramp is now being put into working order. First off, the individually constructed bents have to get connected. After that, it’s planking time.

New Construction Report: Loading Ramp

Pins prevent the posts and timbers to slip while being drilled.

In order to prepare for the next operation session, I set myself the goal to arrange for some operations. So this time there will be no new waggon, but a loading ramp and some cargo.

The ramp’s design is inspired by Scott Perry’s Blog, who has published a very nice and extensive series. If you look for a step-by-step guide, you can find it there.